Profesdionality: 35 years experiences in Instrumentation

ACADEMIC PERFORMANCE:
University (Institute Technology “10-Nopember “Surabaya) first rank in Engineering Physics, graduated with honor.

OVERSEAS WORK EXPERIENCES:
1. Singapore – Combustion Engineering Pte Ltd Singapore
2. Yokohama, Japan – JGC Corporation Ltd.
3. Aberdeen, Scotland – Brown & Root Energy Ltd
4. Adana, Turkey - Kare Engineering

EDUCATION:
Graduated Engineer (with honor) in Engineering Physics of “Sepuluh Nopember” Institute of Technology (ITS) Surabaya, on August 1981.

CAPABILITIES:
1. Presenter for technical system and technical product for users and client
2. Good Engineer in hydrocarbon processing facilities, refineries, chemical plant, coal/gas powered plant, coal plant, nylon production plant and gas pipeline distribution, offshore exploration platform/ wellhead.
3. Presenter for oil and gas technology such as safety valve technology etc
4. Technology evaluation, for feasibility studies and prepare study reports
5. Proposal engineering and preparation of technical project proposals.
6. Preparation for requisition for quotation and technical bid evaluation for various package items like process systems, utility system, wastewater treatment plants
6. Trainer for SCADA system, DCS for refineries control.
7. Special skill included gas turbine and compressor control including digital TMR (Triple Modular Redundant) and HIPPS (High Integrity Pressure Protection Systems)
8. Pipeline gas Control & management system using SCADA (Supervisory Control and Data Acquisition System, Optical Fiber Cable and VSAT (Very Small Aperture Terminal) Telecommunication Systems
9. Subsea control systems includes subsea umbilical selection
10. Various type of pipeline anode cathodic protection included specification preparation, pipeline anode calculation.
11. Prepare and review system design review, subsea control system material take off, subsea control System and umbilical review 
12. Prepared 18”-100km, 14-23km, and 12”-5km sacrificial anode cathodic protection calculation,  prepared subsea pipeline cathodic protection anode specification, 
13. Subsea system integrity-test plan review
> Check and review P&ID, keong and kijing flowlines
> Keong/Kijing subsea tree P&ID review
> Bracelet anode calculation
> Umbilical route study and snalysis
> Subsea control system block diagram review
> Single line diagram review
> Subsea control system detailed drawing preparation
> Causes and effect chart preparatiom
> SAVE shart review
14. Provided general instrumentation document
15. 10GBps offshore and onshore optical fiber cable design
16. VSAT systems provider selection
17. SCADA Systems specification review
18. Gas fiscal metering system (28” ultrasonic flow-meter combine with gas chromatography and gas snalyzer) specification preparation
19. Fire and gas safety system (using PLC system) design
20. 28” Hydraulic system gas shutdown valve design
21. Gas Management System (GMS) specification preparation.
22. Instrument data sheet and calculation review
23. Prepared the bid document for GMS includes: schedule of prices, schedule of payment, scope of work etc

WORK EXPERIENCE
Asigned in saveral position with over 35 (thirty five) years total experiences  in the following details

1. 2013 – 2018 Pettamina “Engineering Serviced” as a Technical Advisor. Engineering Serviced is Pertamina’s Project Service Group (PPSG) to Refining Directorate. PPSG will involved in Pertaminas projects as EPC, PMC or owner representative.
2. 2011 – 2012 PT Worley Parson Indonesia as an Telecommunication  and Instrument Engineer for Yadana Subsidence Project Offshore.
3. 2010 – 2011 PT Istana Karang Laut as a Detailed Engineering Lead Electrical and Instrumentation  Engineer assigned for “Petromax” Refinery Project located Bangladesh
4. 2008 – 2010 PT Adhikarya as a Senior Technical Advisor. PT Adhikarya Tbk willing to build an Oil & Gas EPC activity hemce they hire several Oil & Gas Expert accordingly bu in fact the EPC will include tto Power Plant
5. 2007 – 2008 PT Tripatra as Lead Instrument Engineer, Together with Fluor Pty Ltd PT Tripatra has mandatory to deliver FEED result for Area 13 - North Duri Development Project to PT Chevron Pacific Indonesia (CPI).
6. 2005 – 2007 PT IKPT as a Assistant to Engineering Manager. PT IKPT together with PT Adhikarya and WIKA build a JO for Tuban Aromatic Center project.
7. 2003 – 2004 Chiyoda Indonesia with activities for Petrochina International Jabung Ltd. Betara Complex Development (BCD) Project assigned as Package Equipment Instrument Engineer
8. 2003 – 2003 Santos (Sampang) Pty Ltd assigned as Electrical, Instrument and Telecommunication Engineer for FEED and Post FEED Oyong Field Development.
9. 2001 – 2003 PT Amec Berca Indonesia (an Amec Company) assign as Senior  Instrument engineer for CONOCO ADGF (Additional Dry Gas Fields) detailed engineering.
10. 2000 – 2001 PT Tripatra Gulf Consortiums assigned as Senior Instrument Engineer for Gas Transmission and Distribution Project own by Perusahaan Gas Negara (PGN)
11. 1997 – 1999 Self Employed with several engineering activities such as as building drawings redraw own from ARCO etc.
12. 1996 – 1997 Inspindo Mulia as a Pipeline corridor survey Site Survey Sngineer own by Talisman JOB South Sumatra
13. 1996 – 1996 BROWN & ROOT Far East Engineering Pte. Ltd. Singapore for Brown & Root Energy Services, located at Aberdeen, Scotland as Electrical/ Instrument Engineer/ Consultant Engineer with activities for manhours estimation all engineering category for Natuna Treating-Deck Hook-up and Commissioning Study by utilizing national man powers. Check/prepare and review man-hours consumption’s estimation for several instrumentation hook-up and commissioning by using Indonesian labor standard man-hours and rate for the following categories: Instrument Air, Electrical Consumption, Trace Heating among Section hook-up, Fire Protection and Safety Systems, Navigation Aids, Well shutdown etc.
14. 1995 – 1996 PT Wahana Datam Tiara as a Project Manager for Construction of EPC work of 2 (two) Propylene Spherical Tank owned by Pertamina UP VI, Balongan , Indramayu, West Java.
15. 1995 – 1995  Arco International Indonesia. Lead Instrument Engineer for Front End Engineering Detailed for Pagerungan Gas Compression Project. Arco International Indonesia (PT ARII) going to develop gas resource located in Pagerungan Island East Java which the gas pressure were not met with client requirement (400 psig). Hence a gas compressor is utilized to catch up the goal.
16. 1989 – 1995 PT Pertafenniki Engineering as an Engineering Manager for Area 13 and 21 Exor Project Balongan than assigned as Business Development Manager with the scope of work to prepare a market research for EPC contractor possibilities especially for Oil and Gas. Prepare technical a bid proposal for Instrument Engineer for several projects
17. 1988 – 1989 PT Purna Bina Indonesia as Instrument Engineer for Detailed Engineering for Area-19 Parxylene Plant Pertamina UP IV, Cilacap. West Java, Detailed Engineering for Coal Conveyor Belt Automatic Control using a programmable logic controller (PLC). Coal conveyor required to be operated automatically by using a PLC; Detailed Engineering for Huffco, Semberah Gas Facilities Project; Detailed Engineering for Nylon Yarn-66 Production Plant Project
18. 1986 – 1988  PT Indhasana as a Sales Engineer for Bailey Control Instrument technical product.
19. 1984 – 1986 PT Fajarmas Murni as a Sales and office Engineer for Taylor Instrument technical product. Instrumentation products Technical support to the sales engineer for. PLTU Semarang Instrument Inspection.
20. 1980 – 1984 Institute Technology Sepuluh Nopember (ITS) Surabaya as a Junior lectures with Government Employment ID Number /NIP 131 133 888 with the followings responsibilities:
Lecturer for Process Dynamic subject.
Laboratory for Physic Laboratory and Lecture Assistant
Solar Energy Research Team Leader


Tidak ada komentar:

Posting Komentar